PORTFOLIO
Just a few of the projects we have completed.
BAMBOO INSTALLATION
​​
Client : Mr Yaseem
Location : Leicester
Product: Strand Woven Bamboo with Satin Lacquered Finish

Job Specifications:

-
Uplift and Dispose of existing flooring
-
Repair Subfloor
-
Install Bamboo Flooring over quality underlay
-
Manufacture custom made trims from flooring to ensure perfect match
-
Trim doors to allow for flooring
-
Install MDF white undercoated Chamfered skirting.
SOLID DISTRESSED OAK & ENGINEERED OAK INSTALLATION
​​
Client : Holland & Green Architects
Location : Brill, Oxford
Product: Solid Hand Distressed Oak & 189 Enginered Rustic Oak

Job Specifications:

-
Level subfloors (3 seperate sections) and sink in cables to subfloor
-
Install Liquid DPM to subfloor
-
Manufacture stair nosings from solid oak
-
Install Solid Distressed Oak To Bedroom & Staircase Install Engineered Oak to whole groundfloor seamlessly blending inbetween all areas with no thresholds
-
Undercut existing skirtings to allow new flooring underneath
-
Install sunken lighting to Breakfast area flooring
![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() | ![]() |
![]() |
![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
RUSTIC OAK WOOD BLOCK INSTALLATION
​​
Client : Natural Flooring Warehouse
Location : Great Glen
Product: Heavily Rustic Solid Oak wood block

Job Specifications:

- Uplift and Dispose of existing flooring
- Repair & Level Subfloor
- Install Liquid Damp Proof Membrane
- Install woodblock flooring with a herringbone design infield and a 2 block tramline border
- Sand & Fill floor and finish with 3 coats of hard polywax oil
- Trim doors to allow for flooring
- Install MDF white undercoated 170mm Taurus skirting.
![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() |
RUSTIC OAK 1 STRIP PLANK INSTALLATION
​​
Client : Mr & Mrs Playton
Location : Derby
Product: Heavily Rustic Solid Oak Plank 130mm wide Brushed & Oiled Finish

Job Specifications:

-
Install Liquid Damp Proof Membrane
-
Install plank flooring through 3 areas split over 3 levels
-
Create hand made steps from flooring between levels
-
Trim doors to allow for flooring
BELTON LANE PRIMARY SCHOOL GRANTHAM REPAIR & RESURFACE SPORTS HALL
​​
Client : Chris Ward Carpets Ltd
Location : Grantham
Project: Repair & resurface sports hall

Job Specifications:

-
Uplift large damaged sections of strip flooring
-
Prepare exposed subfloor
-
Relay existing strips where possible and replace where not
-
Sand flooring to a final finish of 150grit
-
Apply primer and then 3 further coats of Lecol 2 part lacuer.
-
Buff to final finish
![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() | ![]() |
![]() |
![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() | ![]() |
CLOVERBROOK NATURAL FLOORING
PROFESSIONAL
HARD WOOD
FLOORING
INSTALLERS